Nippa Tech About Us History(Do not use it and do not delete it)
CHPG-3-1 Azam-2 ch-rotor1 mehfooz-1 Tahir-1 slider-3-1024x425[1]

2013

-Appointed as Consultant by JICA for Data Collection and Survey regarding Reform of Power Sector in Pakistan.

-Dispatching Staff to Cheong Pyeong Hydropower project for Assembly of Stator & Rotor

2012

-Dispatches an electrical supervisor to New Bong Escape Hydropower Project in Pakistan with Andritz Technologies, China

-Dispatches an electrical supervisor to Xekaman-3 Hydropower Project in Lao PDR with Andritz Technologies, China

2011

-Dispatches technical staffs to Cheong Pyeong Hydropower Project in South Korea with Voith Fuji Hydro, Japan

-Registered as a construction company in accordance with local regulations in Lao PDR

-Dispatches an electrical supervisor to Theun Hinboun Hydropower Project in Lao PDR with Andritz Hydro, Austria

-Dispatches an Mechanical supervisor to A-Loui Hydro power Project in Vietnam with Voith Hydro GmbH, Germany

2010

-Opens a liaison office in Lao PDR

-Open an office in Shinjuku, Tokyo

2009

-Registered as specified worker dispatching

-Dispatches engineers to Theun Hinboun Hydropower Project in Lao PDR with CMC. Italy

2008

-Nippa Tech becomes incorporated company

-Dispatches engineers to Tana Beles Hydropower Project in Ethiopia with Andritz Hydro, Austria

2001

- Nippa Tech is established as a limited liability company in Shinjuku, Tokyo

1997

-Participates 184 MW Chashma Hydropower Project, Mianwali, Pakistan with Fuji, Japan

1995

-Participates 210 MW Bin Qasim Thermal Power Project, Karachi Pakistan with BVI, USA

1994

-Nippa Tech is established as a partnership in Pakistan, Karachi